Recording Vendor Responses
When vendors respond with pricing, record their quote in Readybuild.
When Vendors Respond
Vendors typically respond via:
- Email with pricing details
- Phone call with verbal quote
- Formal quote document (PDF, Excel)
- Online through their own system
You'll manually enter their pricing into Readybuild.
Receiving a Quote
- Open a quote in Requested status
- Click Receive Quote
- The Receive Quote dialog opens
Enter Pricing Totals
| Field | Description |
|---|---|
| Vendor Quote Number | The vendor's own quote/reference number |
| Subtotal | Total before tax and shipping |
| Tax | Sales tax amount |
| Shipping | Shipping/freight charges |
Enter the totals from the vendor's quote. These override the calculated totals from individual line items.
Attach Vendor Quote Document
Upload the vendor's quote document:
-
Click Upload to add a new file
-
Or click Add Files to link an existing project file
-
Only one file can be uploaded per receive action
-
Click Save and Continue
What Happens After Receiving
When you receive a quote:
- Status changes to Quoted
- Acknowledged Date is recorded
- Acknowledged By shows who received it
- The vendor's pricing is stored for comparison and approval
Updating Received Pricing
If you need to correct the received pricing:
- Open the quoted response
- Click Receive Quote again
- Update the totals
- Save changes
The acknowledgement is updated, not replaced.
Comparing Quotes
For large purchases, request quotes from multiple vendors:
- Create separate quotes for each vendor with the same items
- Send to each vendor
- Record each response as it comes in
- Compare pricing:
- View quotes side-by-side in the Quotes list
- Check the Total and Difference (variance from estimate)
- Review any notes about terms or conditions
Key Comparison Fields
| Field | Meaning |
|---|---|
| Estimated Cost | Sum of item costs based on estimate |
| Total | Vendor's quoted total (subtotal + tax + shipping) |
| Difference | Variance between estimated and quoted amounts |
A negative difference means the vendor quote is higher than estimated. Positive means it's lower.
Requoting
If you need updated pricing or the quote has expired:
- Open the quote
- Click Requote
- Enter a reason for the requote (required)
- Click Confirm
What happens:
- A new quote revision is created
- Original quote shows Requoted Date and Requoted By
- New revision has status Draft with incremented revision number
- Comments/notes are copied to the new revision
- Attachments are NOT copied (add them fresh if needed)
The new revision can be modified and sent to the vendor.
Tracking Quote Revisions
When a quote has been requoted:
- The Parent field links to the original quote
- Revision Number shows the version (1, 2, 3...)
- The Revisions list shows all versions
Declining a Quote
If a vendor quote is unacceptable:
- Open the quote in Quoted or Awaiting Approval status
- Click Decline
- Enter a reason (required)
- Click Confirm
The quote status changes to Declined with:
- Declined Date recorded
- Declined By showing who declined
- Declined Reason saved for reference
Quote Acknowledgement Details
The acknowledgement record stores:
- Vendor's quote number
- Subtotal, tax, and shipping amounts
- Who acknowledged it and when
This information flows to the purchase order when converting.
Next Steps
- Request approval for quotes requiring authorization
- Convert to PO for approved quotes