Linking Estimates
When creating a project proposal or change order, you select which estimate to include in the contract.
Key Points
- A project can have multiple estimates (design, production, alternates)
- You choose which estimate to link when creating the contract
- The linked estimate's totals and line items appear in the contract document
- Design estimates typically used for proposals, production estimates for final contracts
Example Workflow
You create a design estimate for initial proposal, then a detailed production estimate after design approval. The proposal links to the design estimate, while the final contract links to the production estimate.