Design Team KPI Dashboard

Design agreement volume and closing ratio, plus the cycle times between each milestone in the design process.

Accessing the Report

Reports > KPI > Design Dashboard

Available Filters

FilterDescription
Design Fee Date From / toScopes the report by design fee date
DesignerLimits to one planning team leader
DivisionLimits to selected divisions
FunctionLimits by division function
Work TypeLimits by division work type
Division, Function & Work Type filters

The Division, Function, and Work Type filters appear only for companies that classify their divisions (using more than one function or work type). See Divisions for how these classifications are configured.

The three filters are combined: a project is included only when it matches every filter at once. For example, selecting the Handyman (Internal) and Design Build (Operational) divisions together with the Internal function shows Handyman only — it is the sole division that satisfies both.

Leaving a filter blank places no restriction on that dimension, so it reads as "All". Selecting Internal for Function with Division and Work Type blank gives the entire Internal compartment.

Panels

General Information

MetricDescription
Design AgreementsAgreements with a design fee date in range
Projects WonOf those, the ones that went on to sell
Projects Open/DeferredStill open or deferred, so not yet resolved either way
Closing RatioWon ÷ agreements that actually closed × 100

The closing ratio deliberately excludes agreements that are still open or deferred. Counting unresolved agreements as losses would understate the ratio while they are still live.

Cycle Time (Won Projects)

Six measures, each shown as an average, a median, and a project count. All cover won projects only.

CycleMeasures
First Appt. to Design AgreementEarliest first appointment through to the design fee date
Design Agreement to M&PDesign fee date through to the measure-and-plan activity
M&P to Deposit AgreementMeasure-and-plan through to the deposit agreement
Deposit Agreement to WonDeposit agreement through to the close date
M&P to WonMeasure-and-plan through to the close date
Design Agreement to WonDesign fee date through to the close date

Average and median are both shown because they answer different questions. The average tells you total elapsed effort across the period; the median tells you what a typical project looked like. A large gap between them means the range is skewed by a handful of outliers.

Note that these cycles are scoped by different dates — some by design fee date, some by deposit agreement date — so their project counts will not always match.

Won to Project Complete Cycle Time

Days from close date to substantial completion, by division, with average, median, and project count. Covers projects that have actually reached substantial completion.

Exporting

Export CSV downloads all three panels in one file, with a Section column identifying each.